DPW-26-58 Corporal Arthur Nelson – Fuller Street Park Renovation
|
Bid Number: |
DPW-26-58 |
|
Status: |
Closed |
|
Opening Date/Time: |
January 14, 2026 12:00 AM |
|
Closing Date/Time: |
February 05, 2026 02:00 PM |
|
Contact: |
Kiara M. Freeman |
Description:
The City of Everett is interesting in bids for the Corporal Arthur Nelson Play Lot Renovation Project (referred to as Fuller Street Park, is located in Everett, MA. The work includes furnishing all labor, materials, and equipment to demolish and remove the existing playground and site features, implement and maintain erosion and sediment controls, obtain required permits, and complete all necessary site preparation, grading, and drainage/utility work for the proposed improvements. New construction includes a bituminous concrete half-court basketball court, a new splash pad with associated equipment and utilities, and new playground equipment (including swings) with required PIP safety surfacing. Additional improvements include new ADA-accessible concrete walkways, site perimeter modular block wall, fencing and gates, and all related appurtenances, including site furnishings (tables, benches, bike racks), a shade shelter, a new flagpole and park signage, and new landscaping and plantings.
All work is pursuant to the requirements of M.G.L c. 30, § 39M and all other applicable provisions of the Massachusetts General Laws and all other applicable provisions of the Massachusetts General Laws.
Specifications, bid documents, and instructions will be available beginning January 14, 2026 via download at https://cityofeverett.com/bids/. It is the sole responsibility of the bidder to register as a plan holder. Please note all addendum will be posted to the City’s website.
Estimated Cost of Construction: $800,000
Seal Proposals will be received until February 5, 2026 at 2:00 PM at the Procurement Department City Hall, Room 14, 484 Broadway, Everett, MA 02149
Site Visit: Please refer to Bid Manual
The City reserves the right to reject any or all bids and to waive informalities when deemed in the best interest of the City.
Kiara M. Freeman
Chief Procurement Officer
City of Everett
Resources:
| Title | Download |
|---|---|
|
DPW-26-58 Fuller Street Park Renovations - Project Manual |
Download |
|
DPW-26-58 Fuller Street Park Renovations - Plans & Drawings |
Download |
|
Addenda 1 - DPW-26-58 Fuller Street Park Renovations |
Download |
|
Addenda 2 - DPW-26-58 Fuller Street Park Renovations |
Download |
|
Bid Results – DPW‑26‑58 Fuller Street Park Renovation |
Download |